HMF were called out to look at a requirement and carried out a survey of a new area. The HMF drawing office turned the AutoCAD designs around the next day and HMF were on site the day after installing the racking and associated close boarded decking and column guards.
HMF also fitted anti-collapse mesh to the rear of the pallet racking to prevent impact damage from the fork lift truck onto the external fabric of the building.
Hampshire Mezzanine have completed a number of projects over many years for ICE including mezzanine floor offices as well as racking and shelving installations.
HMF also carry out an annual rack safety survey for ICE to check the condition of their racking and then provide a report of any damage that has occurred, thereby keeping their racking safe.